2025 Full Home Guide

NYC Full Home Renovation Costs 2025

Transform your entire home with expert guidance. Complete cost breakdown for brownstones, co-op combinations, and gut renovations.

A full home renovation in New York City is a journey of transformation, an opportunity to completely reimagine a property to fit your vision. Whether you're restoring a historic brownstone, modernizing a Queens single-family home, or combining Manhattan co-ops, understanding the comprehensive costs is the first step in a complex and rewarding process.

This guide provides an expert breakdown of 2025 full home renovation costs, detailing the factors that drive budgets for large-scale projects. To begin your planning with a personalized estimate, use our official NYC Renovation Cost Calculator.

Average Costs by Renovation Scope

For a full home project, the cost per square foot is the most reliable metric. The price escalates based on the level of structural change and the quality of systems and finishes.

🎨

Cosmetic Renovation

$200 - $350 / sq ft
Per Square Foot

A surface-level overhaul including new flooring, full interior painting, new light fixtures, and updates to kitchens and bathrooms without changing layouts. No major demolition or permits required.

🔨

Gut Renovation

$400 - $700 / sq ft
Per Square Foot

Demolition of all interior walls, ceilings, and floors down to the studs. All new electrical, plumbing, and HVAC systems. New layouts for kitchens, baths, and living spaces. Requires extensive permitting.

🏗️

Gut Renovation + Structural Changes

$700 - $1,200+ / sq ft
Per Square Foot

Includes everything in a gut renovation, plus significant structural work like removing load-bearing walls for an open concept, re-framing floors, relocating staircases, or foundation work.

Full Renovation Costs by NYC Home Type 🏙️

The type of home you're renovating is a primary cost driver. A historic brownstone presents different challenges and costs than a post-war single-family home or a co-op combination. The following are typical ranges for a full gut renovation.

Home TypeTypical Size (sq ft)Estimated Gut Renovation Cost RangeKey Cost Factors
Brooklyn Brownstone
2,500 - 4,000 sq ft$1.2M - $2.5M+Landmark (LPC) compliance, restoring historic details, extensive structural repairs, multi-floor system upgrades (plumbing/HVAC).
Queens Single-Family Home
1,800 - 3,000 sq ft$700K - $1.5M+Fewer logistical challenges, but may require significant system upgrades. Zoning rules (FAR) apply if expanding the footprint.
Manhattan Co-op Combination
1,500 - 2,500 sq ft$800K - $2M+The complex legal and architectural process of combining units, strict building rules, intensive plumbing/electrical rerouting.

Where Does the Money Go? A Full Home Budget Breakdown

In a whole-house renovation, architectural design and foundational systems (MEP & structural) represent a much larger portion of the budget compared to single-room projects.

Labor & General Contractor Fees30-35%
Architectural Design & Permits10-15%
Structural Work & Carpentry10-15%
Major Systems (Plumbing, Electrical, HVAC)10-15%
Exterior & Finishes (Windows, Flooring, Millwork)10-15%

Critical NYC-Specific Factors for a Full Home Renovation

Large-scale projects magnify NYC's unique regulatory and logistical hurdles.

Landmarks Preservation Commission (LPC)

If your home is in a historic district, the LPC must approve all exterior work, from window replacements to facade restoration. This adds a significant layer of review, cost, and time to your project.

Adds 3-6 months to timeline

Complex DOB Permitting (Alt-1 vs. Alt-2)

A full gut renovation often requires an 'Alteration Type 1' (Alt-1) permit, which is for major projects that change the use, egress, or occupancy of a building. This is far more complex than Alt-2 permits.

6-12 month review process

Structural Surprises in Older Homes

A 100-year-old home will have secrets. Be prepared for unforeseen issues like rotted support beams, sagging floor joists, or a crumbling foundation, which must be addressed before any finishing work can begin.

10-20% budget contingency needed

The Co-op Combination Process

Physically combining apartments is only half the battle. It requires a lengthy legal process with the co-op board and city, involving updated certificates of occupancy and a deep architectural review.

12-18 month legal process

Project Timelines: A Marathon, Not a Sprint

Patience is key. A full home renovation in NYC has two distinct phases:

1Design & Permitting

6-12+ months

Architectural design, engineering, LPC reviews, and DOB approvals.

  • Architectural drawings & engineering
  • LPC review (if applicable)
  • DOB permit approval
  • Material selection & ordering

2Construction

9-18+ months

The build-out phase, from demolition to final finishes.

  • Demolition & structural work
  • MEP rough-in (plumbing, electrical, HVAC)
  • Framing, drywall & flooring
  • Kitchen, bathrooms & final finishes

Ready to Reimagine Your Home?

A full home renovation is the ultimate expression of your vision and a profound investment in your future. Success hinges on meticulous planning and a partnership with a firm that has mastered the art of building in New York City.

The journey begins with a clear understanding of the potential scope and budget.